Economic impact of over $184,000! Since the 2001 Plant Expansion the throughput of Furnace #4 has been less than the design Operating Equipment Efficiency of 295,140,698 pounds of propane feed. In 2004 the furnace operated 304 of 344 operating days at 69.8% of design. Total throughput for the 2004 calendar year was 205,952,599 pounds of […]
Read More →Optimizing Furnace Efficiency with Six Sigma
on April 21, 2013in Case Studies, Energy Reduction, Operations, Six Sigma
Energy Reduction with Six Sigma
on April 21, 2013in Case Studies, Energy Reduction, Six Sigma
A Total of $48,000 in savings! Problem: There has been significant variability in the electric bill for a fiberglass component manufacturer. There have been large increases even when production was low. The average electric bill is $3,767, with an average usage each month of 17,978 kwh. Causes Inefficient operation of the air compressor Lighting was […]
Read More →Recent Posts
Contact Us
1649 Winding Trail – Springfield, Ohio 45503
Call: 937-390-9773
Fax: 937-390-6338
Email: Info@sls-sixsigma.com